• <kbd id="disgu"></kbd>
      <kbd id="disgu"></kbd>
    • <meter id="disgu"><span id="disgu"><center id="disgu"></center></span></meter>
      精品少妇人妻av无码专区,国产最近最新中文天堂,激情综合色综合久久丁香,亚洲欧洲日韩综合,亚洲午夜久久久久久久久久 ,亚洲公开免费在线视频,中文字幕有码高清日韩,亚洲男同GV在线观看
      您好,歡迎來到濟南通宇恒成自動化工程有限公司網站!

      服務熱線

      當前位置: 首頁- 新聞中心 > 業內資訊
      常見問題
      新聞中心

      電氣成套設備安裝有哪些注意事項?

      發布時間:2023-01-31 來源:http://www.cnchaoda.com/ 瀏覽量:

      電氣成套設備安裝主要包括高壓配電柜、變壓器、避雷器之類的設備,那么電氣成套設備安裝有哪些注意事項呢?下面一起來看看吧。
      The installation of complete electrical equipment mainly includes high-voltage distribution cabinet, transformer, lightning arrester and other equipment. What are the precautions for the installation of complete electrical equipment? Let's take a look.
      1.電氣設備應有足夠的電氣間隙及爬電距離以保證設備可靠的工作.
      1. The electrical equipment shall have sufficient electrical clearance and creepage distance to ensure safe and reliable operation of the equipment
      2.電氣元件及其組裝板的安裝結構應盡量考慮進行正面拆裝。
      2. The installation structure of the electrical components and their assembly plates should consider the front disassembly as much as possible.
      3.如有可能,元件的安裝緊固件應做成能在正面緊固及松托。
      3. If possible, the installation fasteners of components shall be made to be able to be fastened and loosened at the front.
      4.各電器元件應能單獨拆裝更換,而不影響其他元件及導線束的固定。
      4. All electrical components can be disassembled and replaced separately without affecting the fixation of other components and wire bundles.
      電氣成套
      5.發熱元件宜安裝在散熱良好的地方,兩個發熱元件之間的連線應采用耐熱導線或裸銅線套瓷管。
      5. The heating element should be installed in a place with good heat dissipation. The connection between the two heating elements should be made of heat-resistant wire or bare copper wire covered with porcelain tube.
      6.二極管、三極管及可控硅、矽堆等電力半導體,應將其散熱面或散熱片的風道呈垂直方向安裝,以利散熱。
      6. Power semiconductors such as diodes, triodes, silicon controlled rectifier and silicon stack shall be installed in vertical direction on their cooling surface or the air duct of the cooling fin to facilitate heat dissipation.
      7.電阻器等電熱元件安裝一般應安裝在箱子的上方,安裝方向及位置應考慮到利于散熱并盡量減少對其它元件的熱影響。
      7. Electric heating elements such as resistors should be installed above the box. The installation direction and location should take into account the advantages of heat dissipation and minimize the thermal impact on other elements.
      此外這些電氣設備安裝肯定是要注意接線,因為接線一旦出現錯誤后果是不可想象的。做好絕緣測試,及相關試驗,變壓器的油試驗、繞組吸收比、耐壓、相續等測試,另外就是做好接地系統及連接。更多相關事項就來我們網站http://www.cnchaoda.com咨詢吧!
      In addition, the installation of these electrical equipment must pay attention to the wiring, because once the wiring is wrong, the consequences are unimaginable. Conduct insulation test and relevant tests, oil test of transformer, winding absorption ratio, withstand voltage, phase continuity and other tests. In addition, conduct grounding system and connection. Come to our website for more relevant matters http://www.cnchaoda.com Ask!
      首頁首頁 產品產品 電話電話 置頂置頂
      主站蜘蛛池模板: 女人被狂躁60分钟视频| 国产精品自在拍在线播放| 无码av无码天堂资源网| 熟女亚洲综合精品伊人久久| 男人女人做爽爽18禁网站| 国产性生大片免费观看性| 美女粉嫩饱满的一线天mp4| 亚洲精品国产高清一线久久 | 免费毛片在线| 中国精品国产yw在线观看 | japanese久久中文字幕| 131美女视频黄的免费| 99热这里只有精品在线观看| 国产午夜亚洲精品久久| 人妻无码一区二区三区四区| 91麻豆亚洲国产成人久久| 国产成人精品三上悠亚久久| 日韩有码中文在线观看| 乱人伦无码中文视频在线| 色悠悠成人综合在线视频| 试看a级看一毛片二十分钟| 国产aⅴ天堂亚洲国产av| 扒开双腿操女人逼的免费视频| 玩弄中年熟妇正在播放| 精品一区二区不卡免费| 中文字幕国产精品资源| 熟女人妻aⅴ一区二区三区麻豆| 67194在线午夜亚洲| 久久69精品久久久久久HB| 亚洲人成绝费网站色www吃脚| 波多野结衣爽到高潮大喷| 国产成+人+综合+欧美亚洲| 色色中文字幕| 91丝袜美腿高跟国产老师在线| 精品久久久无码人妻中文字幕| 色九月亚洲综合网| 四川丰满妇女毛片四川话| 18岁以下禁止看很黄的视频在线观看 | 日韩欧美亚洲综合久久| 丝袜足控一区二区三区| 女人做爰高潮呻吟17分钟|